Tender Agent

Your tender validation takes weeks. You submit knowing something's missing.

Construction tenders run 50–200 pages. Your pre-construction team spends weeks validating a drafted response against every requirement. Deadlines don't wait. You submit with gaps you know are there — and lose on quality, not price.

Today
2–6 weeks
Of manual validation · gaps on submission
With Tender Agent
Hours
Every requirement mapped · gaps flagged

Your bid team receives a tender. They read the scope, bill of quantities, compliance requirements, evaluation criteria. They draft a response. Then someone validates that response against every requirement in the tender — line by line — catching omissions, pricing anomalies, compliance risks before submission.

That validation pass takes 2–6 weeks for a major tender. Most of it is manual document comparison. When the deadline gets tight, validation gets cut short. Gaps go to submission.

What you've probably already tried

  • Tender management systems. Help with tracking and workflow. Don't validate a drafted response against a specific tender.
  • More junior estimators or BoQ staff. Cost scales linearly. Throughput plateaus at the review bottleneck.
  • Checklists. Useful until a tender has 400+ requirements. Then checklist fatigue kicks in.

The cost of doing nothing

  • Losing bids on price-competitive responses with gaps.
  • Senior bid manager as the single point of failure.
  • Declining tender-win rate as tenders grow in complexity.
  • Teams submitting work they're not confident in.
3-min demo
Loom embed — swap iframe here when recorded

Watch the system validate a mock tender end to end.

A custom Tender Agent trained on your historical bids, pricing, won/lost outcomes, and your drafted response for the current tender. It extracts all requirements from the incoming tender, maps each to a section in your draft, flags gaps and compliance risk and pricing anomalies, and produces a structured review report for your bid manager.

Validation time goes from weeks to hours. Your bid manager reviews flagged items instead of reading the whole tender cover to cover.

V1 is validation, not drafting

We start with validation — faster to build, faster to trust, compounds immediately into every future tender. Drafting from scratch is a v2 engagement after validation has proven itself.

When a drafted response is ready
01
Extract
Every requirement
02
Map
To draft sections
03
Flag
Gaps, anomalies
04
Report
Structured review
05
Update
As changes land

The 5-step delivery

  1. 01
    Discover — current tender validation workflow, deadlines, typical tender scope.
  2. 02
    Map — what gets checked, what gets skipped under time pressure, where errors slip through.
  3. 03
    Prepare data — ingest past tenders, won/lost history, pricing inputs.
  4. 04
    Add intelligence — requirement extraction, gap detection, anomaly flagging.
  5. 05
    Build software — review UI integrated with your tender management tool, SharePoint, or Drive.
Timeline
4–8 weeks
Kickoff to working prototype
Total price
€15–25K
Direct-pay, milestone-structured
Built for

Nordic construction SMBs. 20–200 employees. Active tender pipeline. General contractors and specialty trades with recurring RFP exposure.

“Our tenders are all custom — no two are alike.”

Exactly why validation works. The system doesn't template tenders. It reads each tender fresh and compares it to your drafted response. The intelligence is in requirement extraction and gap detection, not template matching.

“Our bid manager won't trust AI output.”

Correct reaction. The system flags items for review; it doesn't auto-approve anything. Every flag is reviewed. After 3 tenders, trust comes from seeing what it catches that manual review missed.

“What if the tender is in Swedish, Norwegian, or Finnish?”

Model handles multilingual. We validate on your language during the engagement. Unusual tender formats get scoped in week 1.

“What if our drafted response is the problem, not the validation?”

Honest answer: v1 won't fix weak drafts. It will show you, specifically, where your drafts are weakest across many tenders — which is the input to a v2 drafting engagement.

Curious what AI could do
for your business?

15 minutes. No sales pitch. We look at your business and tell you honestly where AI helps — and where it does not.

Book a free consultation